- Ensure power isolated to machine.
- Overall Clean
- Remove dust and debris from machine
- Scour Exposed steel and apply light coating of machine oil to protect from oxidization
- Visually observe all wire connections for obvious damage
- Accuracy/Performance
- Jog Axes to check for unusual audible artifacts
- Perform 4 point test confirming XY squareness withing 1mm
- Report Findings in maintenance logs
- ATC
- Inspect all tooling for damage and cutting edge integrity and replace tools when necessary
- Run Function 26 (measure all tools) and inspect Auto change motion for alignment as it picks up the various tools
- Inspect pneumatic lines for excess moisture and correct pressure regulations
- Vacuum Pump
- Inspect and clean vacuum filter
- Inspect all connections and piping
- Dust Extraction
- Vacuum all dust in room and remove dust bags
- Clean inside of dust bag carriage if applicable
- Inspect all connections in and pipes for blockage
- Clean gates
- CNC bed
- Remove waste board
- Vacuum surface and check for possible damage and holes
- Fill and sand holes with metal putty
- Thin and clean and remaining adhesive
- Test vacuum bed and clean and clogged holes
- Insert new wasteboard and seal edges with tape
- Run First Facing routine with wasteboard facing tool